Skip to content
AeroSystems
SolutionStatus: Planned

Supplier Quality — One Evidence Standard Across the Supply Chain

Supplier FAIRs and inspection records reviewed against the same requirements as your own.

01

Problem

Primes and tier suppliers exchange FAIRs and inspection reports as PDFs and spreadsheets in different formats. Reviewing them against the drawing is slow, and the reasons behind an acceptance or rejection are hard to find later.

02

Who experiences it

  • Prime contractors
  • Tier suppliers
  • Supplier quality engineers

03

What Gamyaa helps with

  • Receive supplier FAIRs against the same characteristic structure
  • Review supplier inspection records requirement by requirement
  • Record acceptance or rejection with reasons and evidence

04

Engineering flow

  1. Supplier FAIR
  2. Inspection Records
  3. Review
  4. Accept / Reject
  5. Evidence

05

Evidence & outcome

  • Supplier evidence held to the same standard as internal evidence
  • A traceable acceptance and rejection history per supplier and part
  • A foundation for supplier risk insight (planned)

06

Related product

  • DAQIP™

    Defence Aerospace Quality Intelligence Platform

Discuss supplier quality for your team

DAQIP is in development. Talk to us about a demo or about the problem you are solving.